Port Hacking navigation channel dredging
What Swash did Swash provide specialist client-side project management to lead this $2.5m Transport for NSW-funded project under the Boating Now Program. Swash managed procurement and delivery of sub-consultancy work for a Review of Environmental Factors and seagrass mapping. Swash also provided dredging market and procurement advisory services. Swash will project manage delivery of onsite […]
Manning River Entrance
What Swash did Swash provided innovative design and advisory services for strategic assessment of sand management and dredging options at Manning River Entrance. About the project The entrance to the Manning River includes two openings, one at Harrington to the north and one to the south, the Farquhar entrance at Old Bar. The Manning River […]
Gippsland Lakes ocean access dredging approvals
What Swash did Swash provided dredging approvals lead services to Gippsland Ports. Swash facilitated engagement with Commonwealth (DAWE) and State (DELWP) approvals agencies and project managed the delivery of various studies and investigations to support long-term dredging approvals applications. Notably a Marine and Coastal Act consent (Victoria) and Sea Dumping Permit (Commonwealth). Supporting studies project […]
Southport Yacht Club superyacht berth facility
What Swash did Swash provided contractor support through preparation and implementation of a Water Quality Management Plan during dredging and excavation activities to mitigate risk to nearby seagrass and ensure compliance with approvals. About the project The Queensland Government, City of Gold Coast and Southport Yacht Club partnered to deliver a 163-metre Superyacht berth at […]
NSW long-term dredging program business case
What Swash did Swash provided specialist dredging and procurement advice and insights into the preparation of a structured, holistic dredging program for NSW regional ports, which includes 25 regional coastal harbours and 21 trained river entrances. About the project Specialist dredging and procurement advice and insights into preparation of a structured, holistic dredging program for […]
Nerang River dredging investigation
What Swash did Swash undertook a comprehensive desktop investigation to determine the need for sediment removal through dredging or bed-levelling. Swash provided a final report and presentation material for Gold Coast Waters Authority (GCWA) board and management. The aims of this investigation were to: Determine the extent of shoaling with respect to current target navigable […]
Hay Point environmental approvals support
What Swash did Swash provided BHP with niche environmental approvals support and advice over a range of projects. Swash has offered support through: Attendance and input at project and risk assessment workshops Review and input of internal/external approval application material Provide niche environmental approvals advice through pre- and post-submission stages Provide Environmental Impact Assessments. About […]
Gold Coast Seaway, north and south channel dredging
What Swash did Swash provided contractor-side lead dredging project management services to ensure the successful delivery of this project for Gold Coast Waterways Authority and Maritime Safety Queensland. Swash services included: Lead project/contract management Provision of a real-time, project hub dredging dashboard Contract administration Onsite attendance for meetings and supervision Preparation/implementation of Contractor Dredge Management […]
Barmah Choke sand management
What Swash did Swash is providing sand management and dredging advisory services for removal of sand deposits as a consequence of historical activities. Swash services include project management of supporting feasibility investigations and studies. About the project The Barmah Choke is a narrow section of the Murray River that runs through the Barmah–Millewa Forest. The […]
Alberton Boat Ramp
What Swash did Swash provided Gold Coast Waterways Authority (GCWA) with onsite environmental supervision during construction works. Working closely with the GCWA-appointed construction contractor, Swash assisted client to successfully achieve compliance with relevant environmental approvals/codes (Tidal Works, Marine Plants). Environmental management and monitoring included water quality, marine plants, potential acid sulphate soils, sediment runoff and […]