Nerang River dredging investigation

Swash Nerang River dredging investigation

What Swash did Swash undertook a comprehensive desktop investigation to determine the need for sediment removal through dredging or bed-levelling. Swash provided a final report and presentation material for Gold Coast Waters Authority (GCWA) board and management. The aims of this investigation were to: Determine the extent of shoaling with respect to current target navigable […]

Gold Coast Seaway, north and south channel dredging

Swash Gold Coast seaway north and south channel dredging

What Swash did Swash provided contractor-side lead dredging project management services to ensure the successful delivery of this project for Gold Coast Waterways Authority and Maritime Safety Queensland. Swash services included: Lead project/contract management Provision of a real-time, project hub dredging dashboard Contract administration Onsite attendance for meetings and supervision Preparation/implementation of Contractor Dredge Management […]

Alberton Boat Ramp

Swash Alberton Boat Ramp

What Swash did Swash provided Gold Coast Waterways Authority (GCWA) with onsite environmental supervision during construction works. Working closely with the GCWA-appointed construction contractor, Swash assisted client to successfully achieve compliance with relevant environmental approvals/codes (Tidal Works, Marine Plants). Environmental management and monitoring included water quality, marine plants, potential acid sulphate soils, sediment runoff and […]

West Crab Island channel dredging

Swash West Crab Island channel dredging

What Swash did Swash provided contractor-side dredging and environmental management support through: Preparation of Contractor Dredge Management Plan Preparation of Environmental Management Plan Environmental training Weekly dredging and environmental compliance reporting to Gold Coast Waterways Authority (GCWA). About the project The Gold Coast Waterways Authority is improving access to the waterways by dredging the West […]